Design and draft plans and details required to get a building permit from the Department of Planning and Permitting of Honolulu
Provide sketches and drawings necessary to develop your concept and idea
Site visit assistance with determining work – remodel/alteration/addition – to new or existing home
Structural engineering, architectural, and erosion and sediment control calculations and certifications, coordinated as required
Erosion and Sediment Control Plan (ESCP) coordination
Create drawings to get a permit from the Department of Planning and Permitting for building violations – structures or additions built without a building permit
Draw plans for a Condominium Property Regime (CPR)
Discuss which is right for you: Ohana Unit or Accessory Dwelling Unit (ADU)
Perform a pre-check to begin the ADU permit process (takes several weeks)
Convert garage or carport to make a patio, new room, or add to a larger space
Create existing “as built” drawings
Revise existing plans